Minutes from May 18, 1987 Interdisciplinary Team meeting. Review of minutes, discussion of the existing conditions portion of the socio-economic technical memorandum, review of the technical memorandum addressing noise, review of the existing…
Correspondence from Stan Nuffer to Rudy Lukez, explaining that Lukez's name has been included in the mailing list to receive information on Logan Canyon study with an enclosed introduction to the study (not included with this item).
Correspondence from Bruce Pendery to Dave Berg stating the reasons why a supplemental environmental impact statement (SEIS) should be prepared, explaining that flawed data and lack of public involvement have made the current EIS unusable. Suggests a…
Versar project conference record for US-89, Farmington to South Ogden, suggesting an access option from I-15/US 89 for the west Farmington area with a discussion on the wetlands, transportation master plan issues, and Burke Lane access options.
Correspondence from Margaret Pettis to Craig Zwick requesting to be kept informed on the proposed changes of Logan Canyon and expressing concerns about widening the road and increasing the speed limit.
Illustrative map of Logan Canyon from Garden City to Logan with a description of the purpose of Citizens for the Protection of Logan Canyon. Also included are alternate suggestions and requests about the construction and proposed improvements in…
Correspondence from M.J. Roberts to Brian Beard regarding the proposed 3rd phase reconstruction of the Logan Canyon Highway mentioning that no campgrouds will be built at Ricks Springs or Wood Camp Hollow, how fill material will be disposed of, and…
Correspondence from M.J. Roberts to Marta Tollerup discussing the changes to China Row picnic site, Woodcamp campground, Cottonwood picnic site, Twin Bridges campground, and two summer recreation residences including the aspects of recreation and…
Additional data for December 22, 1986 Interdisciplinary team meeting with an environmental report schedule, technical memorandum status, and the status of the Maguire Primrose (Primula Maguirei) in Logan Canyon.
A Citizens for the Protection of Logan Canyon analysis of the proposed re-alignment of U.S. 89 in Logan Canyon. Critique of UDOT traffic forecasts by Dr. David Schmipf, Critique of UDOT safety statements by Dr. Jack T. Spence, and a commentary on…
Correspondence from Fern Shepard to Clinton Topham requesting a copy of the Draft Environmental Impact Statement and for the days for comment to be extended to 120 rather than 30 days.
The overall objective of this paper is to describe the methods that were used to develop an interpretive guide for the Logan Canyon Scenic Byway. Included are statements of purpose and need, a literature review, a statement of methodology, the…
A newspaper entitled Canyon Courier based in Hungry Horse, Montana with articles that discuss the safety and economy of proposed changes to United States Highway 2, making it a four-lane highway instead of two. Also a legal update on the Canyon…
Correspondence from Jack Spence to Dale Bosworth stating that the Forest Plan needs to be taken seriously in consideration of the modifications proposed about Logan Canyon.
Correspondence from Jack Spence to James Naegle expressing his concerns about the role of the Interdisciplinary team, concerns about the Environmental Impact Statement, and concerns about his faith in UDOT and CH2M Hill.
Interdisciplinary team meeting additional data for agenda items including scoping process status report for public involvement, draft memorandum for existing roadside parking, technical memorandum of the areas within the canyon that meet criteria for…
Evaluation of preconstruction of Logan Canyon including diagrams of the suggested widening of lanes and a detailed list of stations and their modifications. Also included is an environmental analysis report for Old Juniper Trailhead by Clark…
Correspondence from Chandler St. John to Marta Tollerup discussing the Environmental Assessment Report approved in April 1971 used in preparing another more current report, noting that three sections of the road through Logan Canyon was in need of…
Information regarding a vigil being held in Logan Canyon, donation opportuinites, twelve reasons to oppose the preferred alternative for Logan Canyon, and a summary of the preferred alternative.
Correspondence from Perry City and Willard City regarding the signs regulating truck traffic on Highway 89 thanking John Holmgren for the positive impact of the signs on the communities.
Correspondence from Mark N. Tuttle to James Hansen, April 16, 1990, expressing Tuttle's disappointment in Hansen's support of the conversion of Highway 89.
Four page fact sheet of the Logan Canyon Study from November 1986 by Utah Department of Transportation and CH2M HILL summarizing the area's transportation needs, roadway conditions, safety, and maintenance. Also included are graphs and tables…
An 8 page project introduction by the Utah Department of Transportation (UDOT) that outlines the purpose of the Logan Canyon study, listing three main objectives.
Correspondence from Daniel Watt to Thomas Lyon, October 5, 1979 acknowledging concerns about traffic and safety analyses and the classification of Logan Canyon.
Minutes from May 18, 1987 Interdisciplinary Team meeting. Reviewed minutes, discussed existing conditions, and reviewed technical memorandum addressing noise.
Minutes from September 8, 1986 Interdisciplinary Team meeting. Review of minutes, draft traffic forecast technical memorandum, and manual traffic counts.
Minutes from September 22, 1986 Interdisciplinary Team meeting. Review of minutes, traffic characteristics, traffic capacity, and general environmental factors.
Minutes from November 3, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of alternate routes to Logan Canyon, discussion of goals and objectives tech memo, alternate alignments from the summit to Garden City, and a preview of…
A memo from Stan Nuffer detailing the minutes from the Interdisciplinary Team meeting from January 26, 1987. Reviewed previous meeting's minutes and discussed alternatives.
Minutes from August 25, 1986 Interdisciplinary Team meeting. Review of minutes, draft traffic forecast technical memorandum, manual traffic counts, existing roadway features, and general discussion.
Minutes from December 8, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of issues and concerns, discussion of schedule for completion of the scoping process, update of final visual classification, and layouts for component…