Logan Canyon, Utah. Second Dam, ca. 1903. Logan River below Second Dam, showing intake flume of Hercules Power Plant. Black and white photograph (7.5 x 9.5 in) mounted on board
Memorandum to the Interdisciplinary Team members on the subject of traffic forecasts through 2010. Also includes population forecasts estimated for all the counties in Utah from 1940 to 1970, and specific county projections from 1970 to 1985
Boy Scouts at Jardine Juniper. Inscription on verso reads, 'Old Juniper-Cottonwood Ridge Logan Canyon Age 3000-3500 years old determined by annual ring count from increment borings by Geo. R. Hill Jr. Picture taken 1923.' Black and white photograph…
Minutes from August 11, 1986 Interdisciplinary Team meeting. Randy Nielsen's name added to mailing list. Review of minutes, draft traffic tech memo, manual traffic counts, maintenance information, and accident data.
Minutes from August 25, 1986 Interdisciplinary Team meeting. Review of minutes, draft traffic forecast technical memorandum, manual traffic counts, existing roadway features, and general discussion.
A memo from Stan Nuffer detailing the minutes from the Interdisciplinary Team meeting from January 26, 1987. Reviewed previous meeting's minutes and discussed alternatives.
Minutes from July 28, 1986 Interdisciplinary Team meeting. Review of minutes, traffic count data, presentation of proposed traffic forecast, highway capacity and level of service determination, review of accident data, and an update on status of base…
Minutes from the 24th Interdisciplinary Team meeting on July 31, 1987 at UDOT district office in Ogden, Utah. Also included is a corrected Figure 6-1 for Traffic Capacity Technical Memorandum and labeled map, and written comments on Visual Technical…
Minutes from May 18, 1987 Interdisciplinary Team meeting. Reviewed minutes, discussed existing conditions, and reviewed technical memorandum addressing noise.
Minutes from September 22, 1986 Interdisciplinary Team meeting. Review of minutes, traffic characteristics, traffic capacity, and general environmental factors.
Minutes from September 8, 1986 Interdisciplinary Team meeting. Review of minutes, draft traffic forecast technical memorandum, and manual traffic counts.
Minutes of June 23, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of role of Interdisciplinary Team, level of documentation required, public involvement program outline, and the schedule.
Public correspondence from Federal Highway Administration, February 11, 1987 stating when and where public scoping meetings will be held, CH2M Hill's role in the Logan Canyon study, general proposed improvements along the Canyon Road, and who to…
In Ron Goede's first interview he talks about growing up in Nebraska, earning a bachelor's degree from the University of Nebraska, Lincoln, joining the Air National Guard in Nebraska, attending Utah State University to earn a Master's Degree in…
Paper stating the importance of highway safety which involves two major issues: accident ratesa and the severity of accidents. Analysis of the Utah Department of Transportation statistical accident data show that the number of accidents in Logan…
Spillway of the State Power Plant at First Dam in the mouth of Logan Canyon, Utah, taken from the east side of the dam. 1920s. Black and white photograph (5 x 7 in) mounted on board
Memorandum from Stan Nuffer to the Interdisciplinary Team on July 22, 1987 with an attached list of the potential spot improvements, mile posts, exisiting conditions and potential actions.
According to local legend, a mysterious presence haunts St. Anne's Retreat in Logan Canyon. Voiced by David Sidwell. Part of the Stokes Nature Center's podcast series History and Lore of Logan Canyon where each podcast is linked to a specific site…