The preliminary record of decision for US Highway 89, Right Fork in Logan Canyon to Garden City and Final Environmental Impact Statement. The six sections include decision, alternatives considered, section 4(f), measures to minimize harm, monitoring…
Critiques on Logan Canyon construction with a general summary, critique of traffic forecast, traffic accidents in Logan Canyon from 1970-77, effects of road building on Logan River, and an explanation of how the erosive slopes, siltation of the river…
Additional data for agenda items from January 26, 1987 Interdisciplinary Team meeting includes an environmental report schedule, outline for scoping meeting, list of figures for slide presentation for scoping meeting, environmental impact statement…
Citizens for the Protection of Logan Canyon proposal for modifications of Logan Canyon emphasizing the protection of the canyon's scenic beauty and recreational uses.
Minutes from the interdisciplinary team meeting with a review of minutes, traffic counting and forecasting, and an outline of transportation needs analysis.
Minutes from July 28, 1986 Interdisciplinary Team meeting. Review of minutes, traffic count data, presentation of proposed traffic forecast, highway capacity and level of service determination, review of accident data, and an update on status of base…
Minutes from November 17, 1986 Interdisciplinary Team meeting. Review of minutes, alternate route technical memo, public involvement summary memorandum, public involvement/scoping meeting, review of existing roadside parking, areas meeting critera…
The motion made before the Logan Municipal Council on January 5, 1989 supporting the Utah Department of Transportation and their consultants in the improvements on the Logan Canyon Highway 89
Agenda for the Logan Canyon Study interdisciplinary team, CH2M Hill, Forest Service, Utah Department of of Transportation meeting number 2 in Ogden, Utah on June 23, 1986 where they review the minutes from a pervious meeting on June 10, 1986, discuss…
Minutes of June 23, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of role of Interdisciplinary Team, level of documentation required, public involvement program outline, and the schedule.
Exhibit A of the Logan Canyon environmental study scope of work that lists the numerous tasks to be completed for the project including an analysis of transportation needs such as safety, maintenance, and congestion
Minutes from December 8, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of issues and concerns, discussion of schedule for completion of the scoping process, update of final visual classification, and layouts for component…
Minutes from August 25, 1986 Interdisciplinary Team meeting. Review of minutes, draft traffic forecast technical memorandum, manual traffic counts, existing roadway features, and general discussion.
A memo from Stan Nuffer detailing the minutes from the Interdisciplinary Team meeting from January 26, 1987. Reviewed previous meeting's minutes and discussed alternatives.
Minutes from September 22, 1986 Interdisciplinary Team meeting. Review of minutes, traffic characteristics, traffic capacity, and general environmental factors.
Minutes from September 8, 1986 Interdisciplinary Team meeting. Review of minutes, draft traffic forecast technical memorandum, and manual traffic counts.
Minutes from May 18, 1987 Interdisciplinary Team meeting. Reviewed minutes, discussed existing conditions, and reviewed technical memorandum addressing noise.
Motion made before the Logan Municipal Council to support the Utah Department of Transportation in evaluating and upgrading Logan City highways, January 5, 1989.
An 8 page project introduction by the Utah Department of Transportation (UDOT) that outlines the purpose of the Logan Canyon study, listing three main objectives.
Four page fact sheet of the Logan Canyon Study from November 1986 by Utah Department of Transportation and CH2M HILL summarizing the area's transportation needs, roadway conditions, safety, and maintenance. Also included are graphs and tables…
Evaluation of preconstruction of Logan Canyon including diagrams of the suggested widening of lanes and a detailed list of stations and their modifications. Also included is an environmental analysis report for Old Juniper Trailhead by Clark…
A Citizens for the Protection of Logan Canyon analysis of the proposed re-alignment of U.S. 89 in Logan Canyon. Critique of UDOT traffic forecasts by Dr. David Schmipf, Critique of UDOT safety statements by Dr. Jack T. Spence, and a commentary on…
Various papers commenting on the Logan Canyon construction project, 1994. Included: Citizens for a Safe and Scenic Logan Canyon summary of UDOT plan of action and Conservationist plan of action, time filing lawsuit under NEPA, and comments on Logan…
Correspondence from Bruce Pendery to Dave Berg stating the reasons why a supplemental environmental impact statement (SEIS) should be prepared, explaining that flawed data and lack of public involvement have made the current EIS unusable. Suggests a…
Minutes from May 18, 1987 Interdisciplinary Team meeting. Review of minutes, discussion of the existing conditions portion of the socio-economic technical memorandum, review of the technical memorandum addressing noise, review of the existing…
Memorandum from Stan Nuffer to the Interdisciplinary Team on July 22, 1987 with an attached list of the potential spot improvements, mile posts, exisiting conditions and potential actions.
Minutes from the 24th Interdisciplinary Team meeting on July 31, 1987 at UDOT district office in Ogden, Utah. Also included is a corrected Figure 6-1 for Traffic Capacity Technical Memorandum and labeled map, and written comments on Visual Technical…