what does this appear like?
Search using this query type:

Search only these record types:






Advanced Search (Items only)

Browse Items (167 total)

  • Spatial Coverage is exactly "Logan Canyon (Utah)"

USUP00140863.jpg
Wagons on dirt road along the river in Logan Canyon, Utah. Cyanotype photograph (6 x 8 in)

USUP00140862.jpg
Dirt road leading through Logan Canyon along river. Cyanotype photograph (6 x 8 in)

USUA0573a.jpg
Logan Canyon, Utah. CCC Camp barracks near Tony Grove - later used as Utah State University's Forestry Field Station Camp- 1930s. Black and white photograph (4.5 x 6.5 in) mounted on board

USUP0031UT046.jpg
The Cascade, Logan Canyon. Color postcard, ca. 1935. (3.5 x 5.5 in)

USUA2888.jpg
Logan Canyon, Utah. Wooden flume carrying water to Utah Power and Light Company Hydro Electric plant at mouth of Logan Canyon, ca. 1908. Black and white photograph (8 x 10 in) mounted on board.

USUA0347.jpg
Logan Canyon, Utah. Scenes, pipeline, ca. 1920s. Black and white photograph (6 x 8 in) mounted on board

USUA3951.jpg
Utah Power and Light plant at mouth of Logan Canyon - formerly Telluride Power. Black and white photograph (6 x 12 in) mounted on board

USUP036611106.jpg
Man crossing the river, while snowshoeing in Logan Canyon. Black and white photograph (4 x 5 in)

USUA3149.jpg
Logan Canyon, Utah. Views, 1920s. View looking upstream at Utah Power and Light Company power plant near mouth of canyon (1/4 mile). Black and white photograph (6 x 8 in) mounted on board

A4874.jpg
View east shows Telluride Power Company operations at the mouth of Logan Canyon. ca. 1900. Cache D.U.P. Collection. Black and white photograph (8 x 10 in) mounted on board

USUA0649.jpg
Logan Canyon, Utah. Worker's camp, 1930s. Wheeler and England Construction Company camp during building of Logan Canyon Road, U.S. 91. Black and white photograph (4.5 x 7.5 in) mounted on board

USUP00140864.jpg
Logan River Power Plant. Cyanotype photograph (6 x 8 in)

USUA3293a.jpg
On the Ridge. Logan Canyon, Utah. July 8, 1913. Black and white photograph (3 x 5.5 in) mounted on board

USUA3277b.jpg
Logan Canyon. Power plant structures, 1915. Black and white photograph (3 x 5 in) mounted on board

USUA2343.jpg
Logan Canyon, Utah. ca. 1978, Black and white photograph (6 x 8 in) mounted on board

USUA3029c.jpg
Cattle. Logan Canyon, Utah. Black and white photograph (3 x 4.5 in) mounted on board

USUA2639a.jpg
Logan Canyon, Utah. Sawmills, 1900. Water power sawmill devised and operated by Mr. and Mrs. Hans H. Hansen. Black and white photograph (5.5 x 7.5 in) mounted on board

USUA0600a.jpg
Logan Canyon, Utah. Relief Valve in Utah Power and Light Company flume, 1923-1924. Original Negatives: Logan City Engineer. Black and white photograph (3 x 5.5 in) mounted on board

PO324 06-281.jpg
View looking out of mouth of Logan Canyon onto the valley (Logan LDS Temple and Old Main tower visible)

A0119b.jpg
View of The Island and mouth of Logan Canyon early 1900s. Utah State University Agricultural Extension Service photograph. Black and white photograph (5 x 6.75 inches) mounted on board.

USU_MSS314Bx1Fd15.pdf
Record of decision for US Highway 89 stating that the Federal Highway Administration agrees with the Utah Department of Transportaion in its selection of the Preferred Alternative.

USU_MSS314Bx1Fd7.pdf
Multiple correspondences from members of the Logan Canyon Coalition including a notice of appeal and statement of reasons, and discussion of the modifications proposed for Logan Canyon.

USU_MSS314Bx1Fd13.pdf
Pamphlet explaining the preferred alternative in detail for Logan Canyon.

USU_MSS148VIIIB29_Fd6_Item 2.pdf
Conservationists' spot improvement alternative for locations within Logan Canyon with proposed action, rationale, and impacts and problems with rejected alternatives.

USU_MSS200ForestServiceSeriesWasatchNFBx6_Item 18.pdf
Discussion with Dale Bosworth about the consistency of the Forest Plan with the draft environmental impact statement.

USU_MSS148VIIIB29Fd6_Item 15.pdf
A list of possible improvements to Logan Canyon.

USU_MSS148VIIIB28_Fd8_Page_6.pdf
Detailing the concerns, particularly from environmental groups, of the expansion and reduction of curves in Logan Canyon including a general summary, traffic growth factors, safety factors, and environmental factors. Important addresses and questions…

USU_MSS200_Forest Ser_Item_20.pdf
The handwritten minutes from a meeting on Logan Canyon road on April 30, 1987, where the Forest Service asserts their role and the role of the forest plan in the developments on Logan Canyon.

USU_MSS148VIIIB29Fd6_Item 17.pdf
A list of possbile improvements to Logan Canyon including Bear Lake Summit to Garden City.

USU_MSS148VIIIB28_Fd8_Page_3.pdf
List of district officals, UDOT managment team, Utah highway environmental council, and Federal Highway Administration.

USU_MSS148VIIIB29_Fd6_Item 10.pdf
Evaluation of criteria for making changes to Logan Canyon according to a Visual Quality Objective and the ability for the landscape to absorb man-made alterations without losing the visual character of the Canyon.

USU_MSS148VIIIB29_Fd6_Item 5.pdf
Graphics of type of alterations including cut length and sensitivity rating on roads, riparian, rock cut, on the existing visual conditions.

USU_MSS148VIIIB29Fd6_Item 16.pdf
Discussion outline for component and alternative development with handwritten notes in margins.

USU_MSS148VIIIB29Fd6_Item 22.pdf
Evaluation of present and future traffic needs by looking at roadway design, current traffic volumes, and the traffic patterns in Logan Canyon.

USU_MSS148VIIIB29_Fd2_Item_2.pdf
Booklet for the nomination of Logan Canyon as a Scenic Byway including maps, images, and text.

USU_MSS148VIIIB28_Fd8_Page_4.pdf
Critiques on Logan Canyon construction with a general summary, critique of traffic forecast, traffic accidents in Logan Canyon from 1970-77, effects of road building on Logan River, and an explanation of how the erosive slopes, siltation of the river…

USU_MSS148VIIIB27_Fd4_Page_1.pdf
Minutes from Interdisciplinary Team field trip on April 21, 1987 where the primary purpose was to get an idea of the magnitude of the changes required, spot improvements were observed but were not the subject of this trip.

USU_MSS148VIIIB27_Fd3_Page_4.pdf
Minutes from the environmental assessment meeting of the interdisciplinary meeting including a summary of the scope of work, analysis of transportation needs, location studies, geotechnical investigations, public and agency involvement, agency…

USU_MSS148VIIIB27Fd9_Item 9.pdf
Bar and dot graphs showing the summer daily traffic at the highest hourly volumes (1979, 1982, 1984, 1985), the average daily traffic by day and by month from 1984-1985.

USU_MSS148VIIIB27_Fd3_Page_3.pdf
Minutes from the interdisciplinary team meeting with a review of minutes, traffic counting and forecasting, and an outline of transportation needs analysis.

USU_MSS148VIIIB27_Fd2_Page_11.pdf
Minutes from October 20, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of satety analysis technical memo, study of goals and objectives, discussion of geotechnical investigations, and alternate routes to Logan Canyon.

USU_MSS133Bx10Fd6_Item 4.pdf
Meeting agenda and map of potential Highway 89 route through Logan Canyon, 1980s.

USU_MSS148VIIIB27_Fd2_Page_17.pdf
Minutes from July 28, 1986 Interdisciplinary Team meeting. Review minutes, traffic count data, presentation of proposed traffic forecast, discussion of highway capacity and level of service determination, review of accident data, and update on status…

USU_MSS148VIIIB27_Fd2_Page_10.pdf
Minutes from October 6, 1986 Interdisciplinary Team meeting. Review of minutes, public information meeting, and visual considerations presentation by Clark Ostergard, Garden City meeting.

MSS148VIIIB27Fd1_Item 3.pdf
Lined notebook paper with a list of those attending of the interdisciplinary team.

USU_MSS148VIIIB27_Fd2_Page_13.pdf
Minutes from November 17, 1986 Interdisciplinary Team meeting. Review of minutes, alternate route technical memo, public involvement summary memorandum, public involvement/scoping meeting, review of existing roadside parking, areas meeting critera…

USU_MSS133Bx45Fd8_Item 3.pdf
The motion made before the Logan Municipal Council on January 5, 1989 supporting the Utah Department of Transportation and their consultants in the improvements on the Logan Canyon Highway 89

USU_MSS148VIIIB27_Fd2_Page_14.pdf
Minutes from December 8, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of issues and concerns, discussion of schedule for completion of the scoping process, update of final visual classification, and layouts for component…

USU_MSS148VIIIB27_Fd2_Page_15.pdf
Minutes from January 27, 1987 Interdisciplinary Team meeting. Review of minutes and continued discussion on alternatives.

USU_MSS148VIIIB27_Fd2_Page_12.pdf
Minutes from November 3, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of alternate routes to Logan Canyon, discussion of goals and objectives tech memo, alternate alignments from the summit to Garden City, and a preview of…
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2