what does this appear like?
Search using this query type:

Search only these record types:






Advanced Search (Items only)

Browse Items (167 total)

  • Spatial Coverage is exactly "Logan Canyon (Utah)"

USU_MSS148VIIIB29Fd6_Item 15.pdf
A list of possible improvements to Logan Canyon.

USU_MSS200ForestServiceSeriesWasatchNFBx6_Item 13.pdf
Correspondence from Jack Spence to Dale Bosworth discussing the Agency Alternative for the Logan Canyon improvements project.

USU_MSS200_Forest Ser_Item_2.pdf
Encouraging citizens to write to James Naegle requesting copies of the draft Environmental Impact Statement and support the protection of Logan Canyon.

USU_MSS200_Forest Ser_Item_5.pdf
Correspondence from Rudy Lukez, Steve Flint and Tom Lyon to Dave Baumgartner expressing their concerns about many of the alternatives while questioning while their alternative is not seriously considered, asking for Forest Service to carefully…

USU_MSS200ForestServiceSeriesWasatchNFBx6_Item 11.pdf
Correspondence from Jack Spence to R. James Naegle identifying the problems with the Draft Environmental Impact Statement.

USU_MSS148VIIIB29Fd6_Item 26.pdf
Fact sheet for Logan Canyon prepared by CH2M Hill on Feburary 1987 explaining the reasons for improvements, and the proposed alternatives for each section including maps and graphs.

USU_MSS148VIIIB28_Fd8_Page_6.pdf
Detailing the concerns, particularly from environmental groups, of the expansion and reduction of curves in Logan Canyon including a general summary, traffic growth factors, safety factors, and environmental factors. Important addresses and questions…

USU_MSS200ForestServiceSeriesWasatchNFBx6_Item 15.pdf
Correspondence from Dick Carter to Dave Baumgartner, expressign concern over the maintaining the existing values of Logan Canyon and coming to a reasonable solution for all agencies involved.

USU_MSS148VIIIB28_Fd8_Page_5.pdf
Correspondence from Keith P. Lautenbach to Brian Beard of the Sierra Club in response to Beard's previous correspondence about the FHWA's compliance with NEPA and other agency regulations.

USU_MSS200_Forest Ser_Item_3.pdf
Correspondence from Margaret Pettis to Craig Zwick requesting to be kept informed on the proposed changes of Logan Canyon and expressing concerns about widening the road and increasing the speed limit.

USU_MSS200ForestServiceSeriesWasatchNFBx6_Item 12.pdf
Correspondence from Fern Shepard to Clinton Topham requesting a copy of the Draft Environmental Impact Statement and for the days for comment to be extended to 120 rather than 30 days.

USU_MSS200_Forest Ser_Item_10.pdf
The overall objective of this paper is to describe the methods that were used to develop an interpretive guide for the Logan Canyon Scenic Byway. Included are statements of purpose and need, a literature review, a statement of methodology, the…

USU_MSS148VIIIB28_Fd12_Page_1.pdf
A Citizens for the Protection of Logan Canyon analysis of the proposed re-alignment of U.S. 89 in Logan Canyon. Critique of UDOT traffic forecasts by Dr. David Schmipf, Critique of UDOT safety statements by Dr. Jack T. Spence, and a commentary on…

USU_MSS148VIIIB28_Fd8_Page_8.pdf
Correspondence from Thomas Lyon to Gary Lindley requesting information from the Utah Department of Transportation concerning the progress of the suggestions made about changing Logan Canyon and the concerns about a proper representation of the…

USU_MSS148VIIIB28_Fd12_Page_2.pdf
Correspondence from Jo Jones to Brian addressing his concerns and giving him the names and locations of people to contact to ensure than an EIS is produced

USU_MSS200_Forest Ser_Item_21.pdf
Correspondence from Jack Spence to James Naegle expressing his concerns about the role of the Interdisciplinary team, concerns about the Environmental Impact Statement, and concerns about his faith in UDOT and CH2M Hill.

USU_MSS200_Forest Ser_Item_20.pdf
The handwritten minutes from a meeting on Logan Canyon road on April 30, 1987, where the Forest Service asserts their role and the role of the forest plan in the developments on Logan Canyon.

USU_MSS200ForestServiceSeriesWasatchNFBx6_Item 14.pdf
Correspondence from Dick Carter to Desmond Anderson defending Utah Wilderness Association's role in maintaining the exisiting quality of Logan Canyon.

USU_MSS148VIIIB28_Fd8_Page_1.pdf
Correspondence from M.J. Roberts to Brian Beard regarding the proposed 3rd phase reconstruction of the Logan Canyon Highway mentioning that no campgrouds will be built at Ricks Springs or Wood Camp Hollow, how fill material will be disposed of, and…

USU_MSS148VIIIB29Fd6_Item 17.pdf
A list of possbile improvements to Logan Canyon including Bear Lake Summit to Garden City.

USU_MSS148VIIIB28_Fd8_Page_14.pdf
Correspondence from Brian Beard to Gary Lindley regarding the proposed construction activities in Logan Canyon. The Sierra Club is concerned about UDOT's compliance with NEPA and wants to have an Enviromental Assessment drawn up.

USU_MSS148VIIIB28_Fd8_Page_3.pdf
List of district officals, UDOT managment team, Utah highway environmental council, and Federal Highway Administration.

USU_MSS148VIIIB29_Fd6_Item 10.pdf
Evaluation of criteria for making changes to Logan Canyon according to a Visual Quality Objective and the ability for the landscape to absorb man-made alterations without losing the visual character of the Canyon.

USU_MSS148VIIIB29_Fd6_Item 11.pdf
Correspondence from Marjorie Lewis stating that she had joined a group for the protection of Logan Canyon feeling that development would destroy the rare and unusual distinction of the Canyon.

USU_MSS148VIIIB29_Fd6_Item 5.pdf
Graphics of type of alterations including cut length and sensitivity rating on roads, riparian, rock cut, on the existing visual conditions.

USU_MSS148VIIIB29_Fd6_Item 12.pdf
Correspondence from Dick Carter to Dale Bosworth mentioning concerns about the widening of Logan Canyon and wishes to set up a meeting to discuss these issues.

USU_MSS148VIIIB29_Fd6_Item 4.pdf
Information regarding a vigil being held in Logan Canyon, donation opportuinites, twelve reasons to oppose the preferred alternative for Logan Canyon, and a summary of the preferred alternative.

USU_MSS148VIIIB29Fd6_Item 16.pdf
Discussion outline for component and alternative development with handwritten notes in margins.

USU_MSS148VIIIB29Fd6_Item 22.pdf
Evaluation of present and future traffic needs by looking at roadway design, current traffic volumes, and the traffic patterns in Logan Canyon.

USU_MSS148VIIIB29_Fd6_Item 3.pdf
Evaluation of visual resources in Logan Canyon and the different impacts for drivers and fishermen, campers, hikers, etc.

USU_MSS148VIIIB29_Fd2_Item_2.pdf
Booklet for the nomination of Logan Canyon as a Scenic Byway including maps, images, and text.

USU_MSS148VIIIB28_Fd8_Page_4.pdf
Critiques on Logan Canyon construction with a general summary, critique of traffic forecast, traffic accidents in Logan Canyon from 1970-77, effects of road building on Logan River, and an explanation of how the erosive slopes, siltation of the river…

USU_MSS200_Forest Ser_Item_4.pdf
Correspondence from Dave Baumgartner to Tom Lyon discussing the possibility of compromise on the changes for Logan Canyon.

USU_MSS148VIIIB29_Fd2_Item_1.pdf
Correspondence from J. L. Mower to Rudy Lukez. Logan Canyon designated as a Scenic Byway. Notes a preliminary evaluation of the Wasatch Variation as the preferred northern route of the Kern River and Wycal pipeline.

USU_MSS148VIIIB27Fd3_Item 9.pdf
Interdisciplinary team meeting additional data for agenda items including scoping process status report for public involvement, draft memorandum for existing roadside parking, technical memorandum of the areas within the canyon that meet criteria for…

USU_MSS148VIIIB27Fd3_Item 11.pdf
Additional data for December 22, 1986 Interdisciplinary team meeting with an environmental report schedule, technical memorandum status, and the status of the Maguire Primrose (Primula Maguirei) in Logan Canyon.

USU_MSS148VIIIB27Fd3_Item 10.pdf
Memorandum from Stan Nuffer with the review of traffic forecasts, scoping comments, dates for meetings, technical memorandum on noise and speed analysis.

USU_MSS148VIIIB27Fd9_Item 14.pdf
Correspondence from Dale Bosworth to Daniel Dake, May 28,1987 discussing how the EIS must comply with the Wasatch-Cache National Forest Land and Resource Management Plan. Bosworth states that the Forest Service supports an objective analysis of Logan…

USU_MSS148VIIIB27Fd9_Item 17.pdf
Correspondence from Dave Baumgartner to Tom Lyon about public concerns for Logan Canyon. Designing the right highway is mentioned, also that the aesthetic issue remains unsolved.

USU_MSS148VIIIB27_Fd3_Page_6.pdf
Outline for scoping meeting presentation, list of slides and the print media that received legal notice, findings from the Logan Canyon study, goals and objectives of the study, alternatives for development, notice of public scoping meetings (and…

USU_MSS148VIIIB27Fd4_Item 6.pdf
Summary of the comments received from the public scoping meetings in Logan and Garden City in March 1987 concerning the proposed Logan Canyon Road project. Legend deliniates + as improvements encouraged, - as improvements discouraged, and ? as…

USU_MSS148VIIIB27_Fd4_Page_1.pdf
Minutes from Interdisciplinary Team field trip on April 21, 1987 where the primary purpose was to get an idea of the magnitude of the changes required, spot improvements were observed but were not the subject of this trip.

USU_MSS148VIIIB27_Fd4_Page_2.pdf
Minutes from March 30, 1987 Interdisciplinary Team meeting. Attendance, review of minutes, scoping meeting summaries, discussion of alternatives C1, D1, D2, and D3, aquatic resources and recreation/land use technical memos, and continued discussion…

USU_MSS148VIIIB27Fd4_Item 10.pdf
Aquatic resources technical memorandum prepared for Utah Deparment of Transportation detailing the existing conditions of the aquatic habitat, fisheries biology, water quality, the impacts and mitigation in the Middle and Upper Canyons and Rich…

USU_MSS148VIIIB27_Fd9_Page_6.pdf
Grid map of Logan Canyon, scale 1 inch.

USU_MSS148VIIIB27_Fd3_Page_4.pdf
Minutes from the environmental assessment meeting of the interdisciplinary meeting including a summary of the scope of work, analysis of transportation needs, location studies, geotechnical investigations, public and agency involvement, agency…

USU_MSS148VIIIB27_Fd9_Page_13 2.pdf
Correspondence from Citizens for the Protection of Logan Canyon representative Stephan Flint discussing the drafted EIS and the how the document could be improved to better reflect the needs and wants of the citizens.

USU_MSS148VIIIB27Fd9_Item 9.pdf
Bar and dot graphs showing the summer daily traffic at the highest hourly volumes (1979, 1982, 1984, 1985), the average daily traffic by day and by month from 1984-1985.

USU_MSS148VIIIB28_Fd7_Page_1.pdf
Comments from local leaders and residents of Cache, Bear Lake, and Rich counties arguing for both minimal improvements to the canyon road claiming it as a destination, and maximum improvement to increase traffic flow and reduce accidents by adding…

USU_MSS148VIIIB27Fd9_Item 16.pdf
Correspondence from Dave Baumgartner to Steve Flint regarding the role of the National Forest Scenic Byway Program proposing a complementary aesthetic experience in the canyon with improvement of campgrouds and appropriate signs. Proposes the…
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2